| Why should I purchase a Done Rite Shed? To Q List | |
|
|
| How can I place an order for my shed? To Q List | |
| There are several ways to place an order with us. With all orders a sales representative will give you a call to confirm your order, go over door and window placements, and to put you on the schedule for a build date. |
|
| What do I need to do to prepare my site for construction? To Q List | |
| What is the placement of runners? To Q List | |
Extra Runners Are Optional At $2.00 A Foot / Includes Blocks![]() 4x4's have a .40 treating rating grade. With a manufacturer's warranty of 40 years at ground contact. |
|
| Are there any additional costs for the shed being constructed on site? To Q List | |
| No...We build on site because many of our sheds are to tall to build to be hauled down the road, while it also preserves the structural integrity of the building. Our built pricing includes delivery (up to 40 miles 2$ a mile over 40), leveling blocks (up to 10") and on site construction. | |
| What is a deluxe gable? To Q List | |
| It is 2nd of three gable style roofs, making the roof 2' wider and 1' longer than the base floor size. Example 10'x12' Floor With A 12'x13' Roof. See Deluxe Gables | |
| What is a boxed gable upgrade? To Q List | |
| It is 3rd of three gable style roof making the roof 2' wider and 2' longer than the base floor size. Example 10'x12' Floor With A 12'x14' Roof. See Box Gables | |
| What are Vinyl Only Sheds? To Q List | |
| They are Low Maintenance Sheds, no aluminum wrapping used around doors or on fascia. So a small amount of painting is needed. See Vinyl Sided | |
| How do I tell if the area is level within 10"? To Q List | |
Stake out the area where your shed will be constructed. Take a piece of string, hold it at the highest corner of the staked out site. Then run it to the lowest corner. Hang a line level on the string to make sure it's level within 10". A line level can be purchased at your local hardware store for under $1.50.![]() |
|
| Do I have to remove the grass? To Q List | |
| No, we can install the shed on the grass. The grass will die because of lack of sunlight. However, a mowed and fecal free site is appreciated :-) | |
| Do I need a permit? Where are my property lines? To Q List | |
| Sheds Done Rite does not require one, however your Town or
Homeowners Association
might. The customer is responsible for the permit. Every town or covenants requirements are different. Sheds Done Rite will help by providing you with diagrams, photos, and talk with any party involved in the process.
If the building
requires stamped drawings there may be a delay in getting the engineers stamp and there may be additional cost to cover the engineer's costs. Helpful Links: Wake County Accessory Structures & Wake County iMaps & City of Raleigh |
|
| What is used for the foundation of my shed? To Q List | |
| We start with solid concrete blocks (1 5/8",2 1/4" and 4"), treated cut offs and shingles to level the 4x4 pressure treated runners (1 per four foot of width). Treated floor joists are 12" on center with 5/8 treated CDX plywood. And as always our floors are customizable. | |
| Can the door be placed in a different location? To Q List | |
| Yes. You choose the location of the door and windows. On some smaller sheds doors may not be moved. |
|
| What size doors come standard with a shed? To Q List | |
| Our standard size double doors are 5'x6' on smaller sheds and 5'x6'6" on larger sheds. Our doors are quite customizable in size. We also install customer supplied doors. We call also supply 6 panel steel doors with an upgrade charge. Our 6 panel door do not have windows in them. | |
| What is the height of the walls? To Q List | |
All sheds come in various 3 heights to suit your NEEDS |
|
| Can I purchase one of your sheds in kit form? To Q List | |
| Yes, we provide a laid out 90%+ precut color coded kit with text directions, diagrams and phone support. We have added NEW Deluxe Kits with pre built walls and fully laid out kits. |
|
| How long does it take to construct the a shed? To Q List | |
| Most in 1 day. Larger sheds may require 2 or 3 days. If you are purchasing a Hardi Plank shed or a Vinyl sided shed, the sider will need a day or 2 on larger sheds. |
|
| Is the shed built on my property? To Q List | |
| Yes, all sheds are precut and laid out at the main plant and are assembled on site. | |
| Will the 4x4 runners that sit directly on the ground decay? To Q List | |
| No. It is treated wood which protects against termites and decay. We also use solid concrete blocks (1 5/8",2 1/4"and 4"), treated cut offs and shingles to level under the runners insuring long life. | |
| How far do you go to build a shed or deliver a shed kit? To Q List | |
Built Sheds Include
Free delivery within 40 miles of our plant based in Zebulon, NC Delivered KITs Include Free delivery within 50 miles of our plant based in Zebulon, NC Only $2.00 per loaded mile beyond the radius. Use Contact / Find Us to check your mileage. ![]() 40 Mile Radius Map The First 40 Miles Of Delivery Is Always Free If You Are 47 Miles From Our Shop The Delivery Charge Is $14.00 (KIT Delivery Still Free) |
|
| What is the time frame on the installation date? To Q List | |
| 1 to 2 weeks from date order placed. At busy times 2-4 weeks from date order is placed. | |
| Can a shed be built on a concrete slab? To Q List | |
| Yes, we also have a subcontractor available to quote and complete your concrete floor. Specifications: We can only build your building without the wooden floor if there is a concrete pad with exact dimensions of the wood floor that normally would be included in the building. Concrete floor must be professionally poured, leveled and squared. (In most cases, old slabs are not suitable for construction without our wood floor.) Our siding and doors overlap on top of floor by 1-1/2" so the concrete pad must be at least 4" above ground level all the way around your slab. Concrete ramps must be also at least 2" lower than the top of the floor. When forming the pad, measure diagonally from corner to corner to make sure pad is square. Concrete has the tendency to push out against the forms; therefore, it's better to begin 1/2" under the final floor size. Example a 10'x12' pad, form to 9'11"x11'11". When a floor deduction is given, all bottom plate material is changed to pressure treated. Our contractor will secure the bottom plate to the concrete. Please NO anchor bolts. |
|
| What is Louisiana Pacific Smart Siding? To Q List | |
Smart Panel treated wood siding is warranted to resist cracking, peeling, separating, chipping or flaking and is pre-primed and ready to paint. It is treated with the EPA registered wood preservative composibor which effectively prevents fungal decay from wood-destroying insects. |
|
| What type of warranty coverage do you offer on sheds? To Q List | |
Vinyl Sided sheds come standard with the 5 year warranty, and are
Maintenance Free. |
|
| What does a good caulk job look like? To Q List | |
![]() |
|
| What does a good paint job look like ? To Q List | |
![]() |
|
| Do I need to be home while my shed is being constructed? To Q List | |
| If possible at start and end to ensure a quality job. |
|
| What are my payment choices? To Q List | |
| We Accept Cash, Checks, Major Credit Cards, & Financing Available Online... | |
| When do I pay for my shed? To Q List | |
| We do not require a down payment on sheds up to 12'x24'. The big sheds do require a down payment. We do expect to be paid for the shed upon completion or delivery of a KIT. We accept cash, check, major credit cards and we have financing available online. |
|
| What color shingles are available? To Q List | |
Nine Shingle Colors To Choose From
|
|
| Do you display sheds at your location? To Q List | |
| Yes,
All Shed Styles Are Open And On Display
At Our Zebulon Store Front. |
|
| What are your hours of operation? To Q List | |
| Office Hours Monday - Friday 9 Am To 6 Pm Saturday 10 Am To 5 Pm Sunday Closed ~ Online 24 / 7 |
|
| How much paint will i need to paint my shed ? To Q List | |
| Use Easy Volume to calculate the square footage of siding on your shed. The coverage amount is listed on the label of the paint can. Paint is usually applied at 350-400 square feet per gallon (primer at 200-300 sq. ft. per gallon). A good paint job takes two coats of paint. Divide this figure given by easy volume by the paint coverage (350 square feet per gallon ), and the result is the number of gallons to purchase. 474 ÷ 350 = 1.4 gallons per coat. |
|
| How Difficult will my KIT be ? | |
| See Shed Kits for a chart or use Easy Volume to calculate it. To Q List | |
CUSTOMER RESPONSIBILITIES |
|
|
Base shed prices do not include sales tax, painting, staining, excavation of site, |
|